Cable socket connections

Heinersdorf-Trebnitz

Kabelmofverbindingen Heinersdorf-Trebnitz 2

On behalf of E.DIS, we are realizing the Heinersdorf-Trebnitz project together with De Romein Group. The project includes 10 cable socket locations with an area of approximately 200 m² each. The construction pits have a depth of 5.00 m from ground level.

For the groundwater lowering we are using a closed system with up to 42 vacuum filters or 8 deep wells to lower the groundwater whereby an extraction flow rate of up to 350 m³/h is achieved. Electric plunger pumps and submersible pumps are used in this process.
The contaminated groundwater is purified via sand filters for iron, a stripping tower for ammonium, activated carbon for TOC and an ion exchanger for phosphorus. We also use our own development: the oxygen treatment system.

Projects