Project image
High-voltage cable route Almelo – Hengelo

Koop Dewatering is supporting Van Gelder B.V. with the implementation of a high-voltage cable route between Hengelo and Almelo in the Netherlands. The aim of the project is to build a future-proof energy infrastructure. In order to carry out the construction work safely and efficiently, targeted groundwater lowering is required - for a stable and dry working environment.

View project
Project image
Power line A-Nord – Section NRW1

As part of the expansion of the A-Nord power corridor, Koop Dewatering and its Special Projects Team are working on the NRW1 section. The approximately 73-kilometre section is part of the 300-kilometre overall route that is to transport wind power from the north to the industrial south of Germany - a key infrastructure project for the energy transition.

View project
Project image
Cable socket connections Heinersdorf-Trebnitz

On behalf of E.DIS, we are realizing the Heinersdorf-Trebnitz project together with De Romein Group. The project includes 10 cable socket locations with an area of approximately 200 m² each. The construction pits have a depth of 5.00 m from ground level.

View project
Project image
Leverkusen, new natural gas transmission pipeline

For the construction of a new natural gas transmission pipeline between Horrem and Bergisch-Gladbach in North Rhine-Westphalia, we were contracted by Denys for the dewatering work. The new DN900 steel pipeline is approximately 24 km long.

View project
Project image
Zuidbroek, nitrogen installation

To reduce gas production in Groningen, Gasunie is building a nitrogen plant near Zuidbroek. The plant covers an area of around 12 hectares and has a capacity of 180,000 m³ of nitrogen per hour.

View project
Project image
Dordrecht, repair Toermalijnring

The company van Burken Buisleiding awarded us the contract for the stress relief dewatering to restore the Toermalijnring water transport pipeline in Dordrecht. Gravity drainage will be used to complete the phreatic package.

View project
Project image
Monaco pipeline

We provide dewatering for the Mornbachtal BA1 (gas pipeline) in southern Germany for the Denys-PORR consortium. The Mornbachtal pipeline is located between Burghausen and Finsen

View project
Project image
EUGAL gas pipeline

As part of EUGAL, a gas pipeline is being built by Gascade Gastransport GmbH in eastern Germany. The gas pipeline comes ashore from the Baltic Sea at Lubmin, and runs south towards Saxony and then across the border to the Czech Republic. In total, the EUGAL construction site covers a length of 810 km.

View project
Project image
Borculo – Laarberg, Construction of a cable route

A 12 km long cable route was laid between Borculo and Laarberg. For our client, we milled in deep drainage or installed filter lances over a length of 9 km. This type of A 12 km long cable route with 6x 20 kV cables is laid from Borculo to Laarberg.

View project
Project image
Val de Saône, vertical dewatering

In the Val de Saône (France), Koop Wasserbau is carrying out a very large contract. For the construction of a new gas pipeline by GRT Gaz, Koop Wasserbau is providing drainage in cooperation with Jan Kwade & Sohn KG.

View project