On-site groundwater drainage: Vacuum pump unit with sand trap in use

IMG_2623

Client: City of Oldenzaal / WATR Group

Project description:
A new drainage system is being constructed in the Primulastraat area, in the immediate vicinity of our headquarters in Oldenzaal. Koop Wasserbau is responsible for the drainage of the new rainwater sewer, while Buitenkamp is taking care of the diversion of the existing sewage sewer. Thanks to the close cooperation within the WATR Group, clients benefit from a central point of contact for all hydraulic engineering services.

Technical implementation:
• Installation of a filter drainage system to ensure safe drying of the trench and safe construction work
• Diversion of the existing sewer over a distance of approx. 350 m, including installation of a pipe bridge
• Use of a powerful pumping system with a capacity of up to 1,000 m³/h to maintain operation during the work

Challenges and solutions:
The challenge lay in carrying out the rainwater and wastewater measures in parallel in a confined space and minimizing disruption to ongoing operations. Thanks to precise planning and clear communication between Koop and Buitenkamp, the project was completed efficiently and without delays.

Result:
This project exemplifies the advantages of the WATR Group: short communication channels, bundled expertise, and a central point of contact for the customer. This creates transparency, efficiency, and trust on the construction site.

 

Hillside Dewatering for the New Neandertal Gymnasium (Erkrath)

In Erkrath, a new secondary school (Gymnasium) with a modern sports hall and an integrated retention basin is being built. Due to the sloping site, Koop Wasserbau is taking on the central task of water management/dewatering. The site requires a combination of deep and shallow foundations. To ensure stability and drainage, Koop Wasserbau is installing deep drains at variable depths and lengths, running parallel to the slope beneath the planned building.

View Project
Grundwasserhaltung vor Ort: Vakuum-Pumpenaggregat mit Sandfang im Einsatz
Project: Expansion of the industrial park

The industrial park in Lienen is being expanded in the area around Ölbergstraße. As part of the road construction work and the construction of a rainwater retention basin, Koop Wasserbau was commissioned to carry out the necessary water drainage measures.

View Project
STEM-Projekt Wassermanagement Bonhoeffer College Enschede

Bei Koop Bronbemaling investieren wir in die Zukunft – ein Projekt nach dem anderen. Gemeinsam mit einer Klasse des Bonhoeffer College in Enschede haben wir in acht Wochen ein MINT-Projekt zum Thema Wassermanagement realisiert. Die Schüler entwarfen und bauten in vier Teams ein funktionierendes Miniatur-Entwässerungssystem, vergleichbar mit den Lösungen, die wir in unseren Projekten anwenden. Mit völliger kreativer Freiheit und unter Anleitung unserer Spezialisten lernten sie Schritt für Schritt, zu messen, zu testen und zu verbessern. Die Ergebnisse waren hervorragend: intelligente Mechanismen, durchdachte Konstruktionen und eine starke Zusammenarbeit. Diese Zusammenarbeit bringt Bildung und Praxis näher zusammen und inspiriert die nächste Generation von Ingenieuren und Denkern. Sind Sie auch an einer Gastvorlesung, einem Workshop oder einem Bildungsprojekt zum Thema Wassermanagement oder Entwässerung interessiert? Nehmen Sie gerne Kontakt mit uns auf – wir denken gerne mit.

View Project