Retention soil filter Bochum

Bochum_4

Client: STRABAG GmbH

As part of the construction of a retention soil filter in Bochum, Koop Dewatering is supporting STRABAG GmbH with the dewatering of an excavation pit flooded by heavy rainfall. The aim of the operation is to drain the excavation pit as quickly as possible and thus ensure that it can be driven over and that construction work can progress safely.

Technical implementation:

  • Use of vertical OTO filters for selective dewatering of the excavation pit surface
  • Use of powerful flush drilling equipment to install the deep drains
  • Use of modern methods for targeted groundwater lowering
  • Preparation of the surface for the drainage machine and other construction machinery

Challenges and solutions:

Heavy rainfall had completely flooded the excavation pit, making it difficult to use heavy machinery. Thanks to quick action, the targeted use of vertical dewatering and experienced specialist personnel on site, the situation was managed efficiently and construction progress was secured.

Result:

Thanks to modern technology and the commitment of our team, the excavation pit was successfully dewatered. The operation once again demonstrates how flexibly and reliably Koop can respond to unexpected challenges – with precision, team spirit and technical excellence.

Our projects

U4 Hamburg

De bouw van de metrolijn U4 in Hamburg is in volle gang! Om ervoor te zorgen dat de stationsbouwputten in den droge kunnen worden ontgraven zijn vele deepwells met onderwatermotorpompen in de bouwkuipen geplaatst. De bemaling is frequentie-gestuurd ingericht zodat onnodige diepere verlagingen en mogelijke risico’s naar de omgeving worden vermeden.

View Project
Grondwaterverlaging in Keulen

Voor de bouw van een meerlaags kantoorgebouw in het hart van Keulen, nabij de Rijn, was een gerichte grondwaterverlaging noodzakelijk. De nabijheid van de rivier stelde bijzondere eisen aan de waterbeheersing om een veilige en droge voortgang van de bouw te garanderen.

View Project
Cable socket connections Heinersdorf-Trebnitz

On behalf of E.DIS, we are realizing the Heinersdorf-Trebnitz project together with De Romein Group. The project includes 10 cable socket locations with an area of approximately 200 m² each. The construction pits have a depth of 5.00 m from ground level.

View Project