N34

Drainage

n34-5

For the construction company FLOOW (combination ReefSalverdaSchagen) Koop Wasserbau GmbH received the order for the dewatering during the construction of 6 tunnels N34.

The different tunnels were partly built at the same time. The Lentersdijk, Willemsdijk and Boshoek tunnels are located in a closed road section.

The Kellerlaan tunnel is operated by a bypass without a road boundary. The Pothofweg and Holthonerweg tunnels were installed at the end of 2018.

Projects